Developer NOC guide

The Nakheel villa NOC

Nakheel's 2023 villa design codes set out what most developers keep behind a login: the application types, the chain through Trakhees and what is never approved. Here it is in the order your contractor will meet it, with the fee and deposit confirmed at application.

Nakheel

Nakheel villa NOC: which application does your job need?

A Nakheel villa NOC is the developer's written consent to alter a villa in a Nakheel community, and Nakheel's own villa design codes set out eight types of application for it. The codes were published by Nakheel Community Management for Palm Jumeirah, Jumeirah Park, Jumeirah Islands, JVT, Al Furjan and Nad Al Sheba Villas, dated February to April 2023. The communities are now run by Dubai Holding Community Management, and Nakheel took the codes down from its live site during that move, so the design rules below come from Nakheel's own documents while the fee and deposit are confirmed with the community office.

How much does a Nakheel villa NOC cost?

Dubai Holding Community Management's 2026 rulebook, which now governs these communities, takes a fee before it processes an application but publishes no amount. Nakheel's 2023 villa design codes set AED 1,000 plus VAT for most applications, AED 5,000 plus VAT per item for an exceptional approval, a refundable AED 10,000 contractor deposit and an NOC in three working days, but Nakheel took those codes down when DHCM took over, so confirm all of it with the community office before you budget. One live charge is on nakheel.com: AED 52.50 per worker for access permits on NOC work.

What are the eight application types?

Nakheel villa design codes, the eight application types, 2023
CodeApplication
MVModification to an existing villa
OWOutdoor works
CT then EVConditional consent, then the villa extension itself
VSRVilla status report, needed before a resale NOC or an extension
RSRetrospective approval of work already done
EXExceptional approval
RVRevalidation, at most twice
TOTransfer of approval to a new owner
Nakheel villa design codes, the eight application types, 2023

Starting before approval costs more. The codes added a non-compliance charge to the application fee on work already commenced or completed, and Dubai Holding's 2026 rulebook fines work carried out without prior approval AED 2,000: a warning first, then the fine, then double the fine on a final notice.

Mediterranean-style villas and palm trees reflect across a calm lake in morning light

Nakheel villa NOC and the Trakhees permit

Nakheel's codes also answer which authority is involved in these communities: the permit in the chain is Trakhees's Modification Permit. Before work: Nakheel NOC, then the Trakhees Modification Permit, then Nakheel's mobilization or modification site-access NOC against a refundable security deposit, then the security gate pass. After work: a Villa Status Report, the deposit refund and the Trakhees Modification Completion Certificate. The refund needs both the Trakhees certificate and a valid status report.

  • The gate pass is issued for a fixed window; after it the pass is blocked and a daily penalty applies until the site is cleared.
  • A status report that finds non-compliance starts a monthly charge until it is put right.
  • NOCs do not pass with the title deed, which is why transfer of approval is its own application.
  • Workers need access permits: AED 52.50 per person for construction, modification and extension work needing Nakheel and Trakhees NOCs.

Ask about the Trakhees step

Works allowed without an NOC

The codes list work that needs no NOC, though the contractor still needs a gate pass: like-for-like repair and maintenance, internal painting, wallpaper and decoration, planting and upstand planters, new tiles or paving at the existing level, refurbishing bathrooms and kitchens without moving walls, replacing cabinets, wardrobes and furniture, and plumbing and minor MEP maintenance. Portable barbecues, garden furniture, retractable shades, kennels, play equipment and side wooden gates without foundations are allowed too. Raising the garden level is not.

What will Nakheel never approve?

  • Dividing a villa for separate letting or extended-family use, or any non-residential use.
  • External staircases, and security screens, bars or shutters over windows and doors.
  • Enlarging front windows and doors excessively, or new openings that overlook a neighbour.
  • Glass in façades or fences with reflectivity above 15 percent.
  • A second car access, or plant and telecom equipment visible from neighbouring plots.
  • Any change to the common boundary wall, including screens or raising it.
  • Raising garden levels, standalone enclosed structures, or work outside the plot.
  • Ficus and Damas (Conocarpus) trees, with the owner liable for damage they cause next door.

Pools follow shared rules too: at least 1 m from the plot limit, all plant, pumps, tanks and chillers fully underground, and a signed owner undertaking not to discharge excavation groundwater into sewers, drains or common areas.

A timber door leans against an unfinished garden wall beside wrapped shrubs and construction tools

What hours can contractors work?

Nakheel-side working-hour clauses by document, read September 2026
DocumentDateHours
Palm Jumeirah Master Community RulesFebruary 2023Garden equipment 9 AM to 5 PM weekdays, 10 AM to 5 PM Saturdays; none Sundays or public holidays
Nakheel Community Management handbook, version 3February 2024Works 7 AM to 5 PM on weekdays only; noisy work after 8 AM
Dubai Holding Community Management rulesJuly 2026Major works 7 AM to 5 PM weekdays; minor works Monday to Saturday 8 AM to 6 PM; noisy work 9 AM to 1 PM and 3 to 5 PM
Nakheel-side working-hour clauses by document, read September 2026

Classify the job before quoting a clause, and never blend two. The 2024 handbook also asks for 48 hours' notice before cement mixers and trailers arrive, bars washing construction vehicles anywhere in the community, and requires workers to be dropped at the site in minibuses of at most 30 seats rather than walking through.

Nakheel villa NOC rules community by community

  • Palm Jumeirah: shade structures up to 20 m² on a standard plot, front fences 0.9 to 1.6 m with at least 60 percent transparency, pergolas 3.2 m flat or 3.84 m pitched, and a published paint colour table.
  • Jumeirah Park: 30 m² of shade, the most generous cap, and a seven-point spec for rebuilding the lake-side rear fence at 1.4 m.
  • Jumeirah Islands: 20 m² of shade for villas and 30 m² for mansions; glass and polycarbonate fencing banned outright.
  • Al Furjan: shade banded by home, 30 m² for a five-bedroom villa, 20 m² for three and four bedrooms, 15 m² for a three-bedroom townhouse.
  • JVT: a flat 20 m² shade cap and no changes to the back fence.
  • Nad Al Sheba Villas: a fixed extension schedule, at most 7.51 m² on a four-bedroom villa and 36.11 m² on a large-plot five-bedroom.

JVC has no published villa design code at all, so its owners work to the Dubai Holding rulebook and the online NOC flow alone; our Dubai Holding guide covers it. The authority side is in our Dubai permits guide, and the other developers sit side by side in the developer comparison. To have contractors who already work to Trakhees rules quote your job, use our renovation contractors Dubai service.

Send us the villa and the job

Questions

Nakheel villa NOCs, answered

Who issues the NOC now, Nakheel or Dubai Holding?
Both statements are published. Nakheel's contact page says to request the NOC from Nakheel's Urban Planning team through the website or the My Nakheel app, and its online services list Request For Villa Alteration. Dubai Holding Community Management's 2026 rules require an NOC from DHCM plus the authorities' consents. Both routes lead to the same online services platform, onlineservices.nakheel.com.
How do I get the security deposit back?
The design codes tie the refund to two documents: the Trakhees Modification Completion Certificate and a valid Villa Status Report. Nakheel's online services list a Construction Security Deposit Release request for it. Keep the site clean and the work as approved, or the status report will not come back clean.
Does a Nakheel NOC transfer when I sell?
No. NOCs do not pass with the title deed, which is why transfer of approval is a separate application. A current Villa Status Report is also a prerequisite for a resale NOC.
What is a Villa Status Report?
Nakheel's check of the villa against its approvals. It is needed before a resale NOC, before an extension and before the security deposit is refunded. If it finds non-compliance, a monthly charge runs from the report date until the work is put right.
Can I convert the garage in Nad Al Sheba Villas?
No. The Nad Al Sheba Villas code prohibits garage conversion outright, along with balcony and terrace enclosures and changes to external elevations. What it does allow is a fixed menu of small internal extensions for a driver's room, maid's room or majlis, chosen from pre-defined areas.
How long does a Nakheel NOC take?
Dubai Holding's 2026 rulebook promises a decision only within a reasonable period, and asks for applications at least 24 hours ahead on the community app or 72 hours ahead by email. Nakheel recommends requesting long-term contractor access permits three to four working days ahead, and says approval typically takes one to two days.

Who you are dealing with

  • OperatorWebsiteOS LLC
  • Licence2646567.01
  • Cost to homeownerNone
  • Figures datedSeptember 2026